Posted in General Production on April 5th, 2017 by Eric AppletonNow that ‘Dancescapes ’17’ is struck, construction on ‘Animal Farm’ begins! Here are some platforms in the shop, just waiting to be legged and bolted together:
These past two afternoons I painted the two drops — one comprised of sheets of plastic, the other erosion cloth. Here they are, drying in the Hicklin:
Here Intro student Jane works with TAs Lilliana and Katie on gridding out the shape of the mud pond:
Speaking of everything to be done on the show, here’s the build chart:
Intro students Steven and Lance in the midst of legging up and bolting together platforming:
The director, Angela Iannone, is going with a ‘found object’ approach to building the windmill, with a ladder as the structural support. While suitcases and crates will be stacked in and around the ladder, I need to build a topper that holds the vanes. Here is the start of that: