Sweeney Todd
Some shots from this afternoon at the start of shop. Here’s the upstage platforming so far, with a rehearsal wagon. The columns and the rest of the staircase are about to be installed:
In the shop itself, a group of students work on framing flats. Oh, and there’s the harmonium there at the garage door. The director and I had just gone to pick it up because he has a van.
Our TD is using the Hicklin theatre as a paint space while flats are being constructed in the shop. Here TA Joe leads some of the Intro to Tech students in applying wheat paste and muslin to the completed flats. Some of the students are trimming muslin from the flats that are already dry.