Sweeney Todd
Friday. We’re now less than a week from first tech. Our TD, Steve, will have another rare Saturday shop session to keep moving forward. There’s still a lot to be done, but on the other hand, I confess that I was quite feaful we would not be as far as we are after only about three weeks of build (remember, except for the two Saturday sessions, the shops are only open from 1-5 Monday through Friday).
Here’s a pic of the stage Friday afternoon. Hang is still commencing, though later in the day, Steve started focussing.
In the Hicklin, Allison got more pieces based and I lined them. Here are the walls for the pieshop wagon and the parlor wagon, nearing completion.
One of my day’s side projects was to work on the trunk in which Pirelli’a body is stashed. We have a large Pirelli, which meant building a larger trunk. It was built a few days ago and they’ve been using it in rehearsal. Here it is, at the midway point of decoration. There’s a little fabric covered slot for his hand to poke out at the near corner.
On Thursday, I built a spigot for the pie shop’s ale cask. I’m rather happy with it.
Finally, here’s Shauna, a member of the Intro to Tech class and part of the prop team. She’s painting the birds cages she designed and built for the bird seller.