Sweeney Todd
Forging ahead on “Sweeney Todd.” At the start of yesterday, here’s the selection of covered and primed flats awaiting further painting:
So my first task of the day was to finish what I’d started the day before, only., doing it in the scene shop since class was happening in the Hicklin:
During actual shop hours, lots of work for everyone. Here are two students pasting down muslin on the edges of the wagon walls. I haven’t seen these two before, so I suspect they’re cast members from the music department doing their production hours:
Here are two more suspected cast members measuring out framing pieces for flats:
Here they are, working with Alex, on the flat itself:
Braden (TA) and Brent (Intro student) work on framing another flat, while Lilliana (TA) is off to the side helping to feed lumber through the table saw:
And a better shot of Alex and Lilliana working together to rip down some lumber:
Back in the Hicklin, Allison does a little pasting down of muslin before priming a wagon flat:
While I drive another flat forward to painted completion:
And as flats get finished, up they go on the stage:
I think that blur is another Allison, on of the Intro students. . .