Some shop progress pics: Lilliana lays something out while Dennis also lays something out.
Steve sealed the floor this morning in preparation of putting up the upstage platforming.
And a close-up of the floor. Just because.
This entry was posted on Friday, January 22nd, 2016 at 8:18 pm and is filed under Scenic Design, Scenic Painting.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or