Muskie Love
With “Deathtrap” closing this weekend, production work continues apace on “Muskie Love.”
Here, leaning against the wall in the Hicklin are the two platformed areas — to the left is the dock and to the right is Roy’s Bait Shop.
On lovely, sunny days, we open the shop doors and do a little work on the loading dock. This is stage manager Alison, who is also doing a fair amount of painting and prop work on the show. She, Anastasia, and Cat are all base painting Roy’s sign.
On the drafting table, the last plate for “Muskie Love” is done — the boat, the counter, and some crates.
Which means I can move onto further paint elevations. Here, things dry for the dock and shop, with a little help from Jerome Robbins.