Romeo and Juliet
“Romeo and Juliet” continues as “Dancescapes” goes into technical rehearsals. This is my current afternoon project; creating the two stained glass pieces. Above, I’m in the process of laying the first one out. . .
. . . and here it is, further along, with some of the leading applied. Once the leading is completed,I’ll fill in the glass, then flip it over and apply leading to the backside as well, since it will be seen from both sides as the unit rotates.
Meanwhile, in the Hicklin, TA Thad sizes facing on the units. There was a mishap — our TD bought out all the brick paneling from one Menard’s, and when he went to a second one, he grabbed what he thought was brick — just tan brick as opposed to red brick (we’re painting it all anyway, so color didn’t matter). Turns out he grabbed feildstone, rather than brick. Looks like the units will have some fieldstone sections and some brick sections. . .