Dracula
Progress on the floor of “Dracula.”
One of the Intro to Theatre students base coats the platforms.
Laying out the wood flooring and one of the areas of stone. The door in back there is left over from classes andnot part of the set.
Glazing the center stone floor.
Drying the grey wash. The student upstage lays out the grid for the tile floor.
And yesterday’s stopping point at the end of shop. The wooden floors are sealed and done. The central stone floor is sealed and done. The upper stone floor needs shadow and a grey wash, and the tiles are in progress. I hope to finish all the floor work by the end of today’s shop hours.