Construction on “Dracula” gets into full swing. Above are some students from the Introduction to Theatre course (and assorted TAs) working on the suspended arches.
And a base coat on the deck. We will begin painting the floor tomorrow afternoon.
This entry was posted on Monday, September 16th, 2013 at 8:07 pm and is filed under General Production.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or