Aladdin

 

 

 

 

 

 

 

Paint work from yesterday.  These are two completed masking flats for the upcoming production of “Aladdin.”  These two flats will be picked up and moved center for the street scenes.  That’s  one of our students off to the side speaking with TD Steve Chene about how they will fix the right hand flat, which was built more rhomboid than square.  The blue pillar will get a diagonally sloping tile pattern.

 

 

 

 

 

 

 

A pause during today’s paint work.  About halfway through laying in the colors.

 

 

 

 

 

 

 

In the shop.  Student in the Intro to Theatre class are covering the arches with cheesecloth preparatory to painting.

 

 

 

 

 

 

 

End of day.  Almost finished with this folding masking flat for offstage right.  A little more line work, some shading on the trees, and then tomorrow it’s onto the final masking flat for stage left.