Major renovations are underway in the CA!
Aug 13th, 2013 by altermas
In order to meet the needs of the Music Department’s large ensembles, the wall is coming down between CA1003 (the choral rehearsal room) and CA1005 (the instrumental rehearsal room). The new, larger space will serve as the music department’s large rehearsal/classroom space.

From the entrance of CA 1003. The wall has four layers that will be removed. The layers helped with the sound proofing between the two rehearsal spaces.

The risers in CA 1003 have been removed.
CA30 in the lower level is being remodeled to serve as the new choral rehearsal space, and will also still be a versatile classroom space for Art courses and World of the Arts.

A view of CA 30 from the back of the room.

A view from the front of the room with the old seats removed.
Finally, work is underway in the Recital Hall, both to install side curtains that will make this an acoustically “tunable” space, and also to install a dedicated sound system.

Workers hang track for sound curtains.