Dracula

IMG_8436

Working up a sketch for the Fall’s production of “Dracula.” We’re doing this in a stadium configuration, with the study on one end and a space that doubles for Mina’s room and the crypt on the other.

The finalized groundplan is due in two weeks. On today’s agenda, first tech for “Our Town.”