Resort 76

Major structural things are happening on the build of “Resort 76!” I got the tattered fabric stapled to battens, which then went up along three of the theatre’s walls. Now the scaffolding is getting put together. Here’s a view of the theatre from the booth:

That’s TD Ruth with students gathered at the table looking at the drawings. Here’s Ruth again, pointing in an instructional manner:

A pic of the west wall:

And last but not least, student KG has signed on to do some painting. Here she is priming the cistern for the toilet. She’s just finished painting the hallway door there on the sawhorses.

Comments are closed.